Contact your admin to get access
Live
Date Range
Building
Group By
Exclude
Overview
Cohort
Funnel
Cost Per Stage
Spend
Attribution
Lease-Up Tracker
Revenue
Forecast
Funnel Pipeline
Leads
sched ÷ leads
Tours Sched.
comp ÷ sched
Tours Comp.
won ÷ comp
Closed Won
Blended Cost Per Stage Paid Spend ÷ All Leads/Stages
Total Spend
Blended CPL
spend ÷ all leads
Blended CP Tour
spend ÷ tours completed
Blended CP Close
spend ÷ closed won
Top Sources by Lead Volume
Source Leads Tours Sched. Tours Comp. Closed Won Close Rate
Top Buildings by Lead Volume
Building Leads Tours Sched. Tours Comp. Closed Won Close Rate
Cohort Analysis — by Lead Create Month
ⓘ Recent cohorts (last 45 days) are marked MATURING — leads haven't had enough time to convert yet, so rates will appear lower than actual.
Loading…
Funnel by True Source
Loading…
Blended Cost Per Stage Paid Spend ÷ All Leads
Loading…
Ad Spend by Building & Channel
Loading…
First Touch = channel that originally brought the lead in. Last Touch (True Source) = channel that gets final credit. Shift = credit moved between channels. Same = consistent attribution.
First Touch → Last Touch Path Analysis
Show:
Loading…
Channel Performance — First Touch vs Last Touch
First Touch Source
Loading…
Last Touch — True Source
Loading…
↑ Using global date range and building filter
Total Monthly ARR
active tenants (rent roll)
Total Realized LTV
rent × months since move-in
Matched Customers
HubSpot ↔ Rent Manager
Avg LTV / Customer
customer-level (all units)
Avg Tenure
months since move-in
Blended CAC
total spend ÷ closed won
Blended Avg LTV
per matched customer
Blended LTV:CAC
target: > 3x
LTV:CAC Gauge
0x 3x target 5x+
Revenue & LTV by True Source
Loading…
Building & Capacity
Building
Total Units
Units Available
Sq Ft Capacity
Total Sq Ft
Sq Ft Leased
Scenario
Base = historical avg · Best = +20% on rates · Worst = −20%
Rate Assumptions (drag to adjust)
Sched. Rate
40%
hist: 40%
Show Rate
42%
hist: 42%
Close Rate
21%
hist: 21%
Budget Assumptions
Blended CPL ($)
Avg Unit Size (sqft)
CPL auto-populated from YTD blended average. Adjust as needed.
Required to Fill Building
Units to Fill
closed won needed
Leads Needed
to generate
Tours Sched.
required
Tours Comp.
required

Budget Required
total spend needed
Per Unit CAC
cost to acquire 1 tenant
Occ. Rate After
if target met
Lead Velocity
wks at current pace

Funnel Waterfall
Sq Ft Occupancy View
Sq Ft Occupancy
of total sq ft
Sq Ft Available
to lease
Unit Equiv.
at avg unit size
Budget to Fill
based on sq ft avail

Leads Needed
to fill sq ft
Cost / Sq Ft
budget ÷ sq ft avail
vs Unit Budget
difference
Weeks to Fill
at current velocity

Sq Ft Breakdown
Leased Available